Rehab cost estimator

Build a renovation budget line by line, add a cushion for surprises and see whether the deal still works under the 70% rule.

What this answers: How much will the work cost, and how much can I still pay for the property? These examples are round starting points, not local prices.

Start from an example, then change any number:

Interior
sq ft
$
units
$
sq ft
$
$
Exterior
$
$
$
$
Systems
$
$
$
Other costs
$
$
$
%
70% rule check
$
%
Rehab budget
$81,075
Cost per sq ft
$54.05
Max purchase price
$128,925
Interior
$42,500
Exterior
$19,000
Systems
$5,500
Other costs
$3,500
Contingency
$10,575
Use this budget in the fix-and-flip calculator
Rehab budget$81,075

How this is calculated

  1. 1Interior = kitchen + bathrooms × cost each + flooring area × cost per sq ft + home size × paint cost per sq ft.
  2. 2Exterior = roof + siding and paint + windows and doors + landscaping. Systems = HVAC + electrical + plumbing. Other = demolition + permits + anything else.
  3. 3Total = those four groups + contingency (a percent of their sum).
  4. 4Max purchase price = ARV × rule % − total.

The figures are yours: example values are round starting points, not local prices. Get contractor quotes before relying on a budget. Holding, financing and selling costs aren't included.

Add this calculator to your site

Frequently asked questions

Where do the example costs come from?
They're round starting points to show how a budget adds up, not local prices. Labor and materials vary a lot by market, so replace them with quotes from contractors before relying on the total.
How much contingency should I use?
Many investors use 10–20%. Lean higher on older homes or when you haven't seen behind the walls, since hidden problems like wiring, plumbing and water damage are the usual surprises.
What does the 70% rule check tell me?
It's the most you could pay for the property if purchase plus repairs should stay within 70% of the after-repair value. It's a rough screen that leaves the rest for holding costs, selling costs and profit.
Does this include holding costs?
No. Loan interest, taxes, insurance and utilities while the work happens are separate. Use the budget in the fix-and-flip calculator to see them and your profit.
Should I do the work myself to save money?
You can save on labor, but count your time and the slower schedule, which adds holding costs. Some electrical, plumbing and structural work also requires licensed contractors and permits.